Efficiency & Alterate Days Problem (2)

Duration: 6 min

This video lesson is available to enrolled students.

Return to /learn/COAL-INDIA-MANAGEMENT-TRAINEE/quantitative-aptitude/time-and-work/alternate-days-remaining-work-problems/asset-efficiency-alterate-days-problem-2 after enrolling

Inside: a video lesson and guided study material.

Module outline

  1. About Course: About the Course
  2. Paper-2 | Programming & Data Structures: C Fundamentals, Control Flow, Functions, Arrays & Pointers, Storage Classes, Structures & Enums, DMA, Macros, Scoping & File Handling, Introduction to DS, Array, Stack, Queue, Linked List, Tree, Graphs, Hashing
  3. Paper-2 | Databases / DBMS & SQL: Basics of DBMS, ER Diagram, Relational Model & Functional Dependencies, Keys & Integrity Constraints, Normalization (1NF - BCNF), Decomposition Properties & 4NF, File Organization & Indexing, Relational Algebra, SQL, Relational Calculus, Transaction Management, Concurrency Control
  4. Paper-2 | Algorithms: Algorithm Analysis, Time Complexity Analysis, Sorting Algorithms, Greedy Algorithms, Dynamic Programming, Minimum Spanning Trees, Shortest Path Algos
  5. Paper-2 | Computer Networks & Security: Introduction to CN, Data Communication, DLL: Access Control, DLL: Flow Control, DLL: Error Control, DLL: Framing, Data Link Layer - Ethernet, Net Layer: IPv4 & Proto, Net Layer: IP Addressing, Net Layer:Routing Protocol, Transport Layer Services, TL: Congestion & UDP, Application Layer, Hardware Basics, Network Access Technologies, Network Security
  6. Paper-2 | Digital Logic: Digital Systems & Boolean Basics, Logic Gates & Hardware, Boolean Expression, Boolean Minimization, Combinational Circuit, Sequential Circuits, Number System, Number Representation, Floating Point Rep
  7. Paper-2 | Operating System: Introduction to OS, Process Management, CPU Scheduling, Process Synchronization, Threads & Process Creation, Deadlock, Memory Management, Virtual Memory, Disc Scheduling, File Management
  8. Paper-2 | Theory of Computation: Introduction to TOC, Deterministic FA (DFA), Non-Deterministic FA, Regular Expressions, Grammar, Regular Language Properties, Moore & Mealy Machines, Pushdown Automata & CFG, Turing Machines
  9. Paper-2 | Computer Organization & Architecture: Basics of COA, Cache Memory Organization, Input Output Organisation, Pipelining, Instr Formats & Modes, Control Unit Design, Programming the Basic Computer
  10. Paper-2 | Compiler Design: Intro to Compilers, Lexical Analysis, Grammar & CFG, Syntax Analysis: Top-Down, Syntax Analysis: Bottom-Up, Semantic Analysis & SDT, Intermediate Code Gen, Code Optimization, Run Time Environment
  11. Paper-1 | General Awareness: Polity, Physics, Biology, Chemistry, Static General Knowledge, GK- Current Affairs, History, Geography, Indian Economy, Environment
  12. Paper-1 | Logical Reasoning: Series (Number and Letter Series) (Numerical Relations and Reasoning), Coding Decoding, Non Verbal Reasoning (Spatial Aptitude) (Spatial Reasoning) (Visual Reasoning), Data Interpretation, Blood Relations, Syllogisms, Deductive and Inductive Reasoning (Logical Deduction and Induction) (Prepositional Reasoning), Selection Decision Table (Decision Making), Clock, Calendar, Cubes & Dices, Directions (Direction Test), Analogy, Seating Arrangements, Analytical Reasoning (Counting Figures Reasoning)
  13. Paper-1 | Quantitative Aptitude: Ratio and Proportion (Ratios), Mixture and Alligation, Permutation and Combination, Number System, HCF LCM, Speed Time and Distance, Average, Age Problems, Percentage, Profit and Loss, Time and Work, Pipe and Cistern, Simple Interest and Compound Interest, Powers and Exponents (Surds and Indices), Mensuration and Geometry, Probability, Statistics, Arithmetic, Algebra
  14. Paper-1 | English: Vocabulary, Comprehension / Reading Comprehension / Unseen Passages (Critical Reasoning) (Paragraph Questions), Sentence Re-arrangements (Para Jumbles) (Narrative Sequencing), Sentence Correction (Error Correction), Sentence Completion (Fill in the blanks), Sentence Construction, Cloze Test (Cloze Passage)
  15. Coal India Previous Year Paper:
  16. Engineering Mathematics: Set Theory, Relations, Functions, Graph Theory, Group Theory, Propositional and Predicate Logic, Linear Algebra, Calculus
  17. Coal India Mock Test:
AI summary & chapters

AI Summary

An AI-generated summary of this video lecture.

This video is a tutorial on solving a work and time problem involving the earnings of men and boys. The instructor, Yash Jain Sir, presents a question where the earnings of 5 men and 7 boys in 6 days and 2 men and 3 boys in 4 days are given, and the task is to find the time for 7 men and 6 boys to earn Rs. 750. The solution method involves setting up equations for the daily earnings of a man (M) and a boy (B), using the given data to find the individual daily earnings, and then calculating the total time required. The video uses a step-by-step approach, first finding the daily earning of a man and a boy, and then applying these values to the final scenario.

Chapters

  1. 0:00 – 2:00 00:00-02:00

    The video opens with a title card for a 'TIME & WORK' lesson, followed by a screen showing a multiple-choice question (Q1) about the earnings of men and boys. The instructor, Yash Jain Sir, introduces the problem: 'If 5 men with 7 boys can earn Rs. 127.50 in 6 days and 2 men with 3 boys can earn Rs. 35 in 4 days, then find the time in which 7 men with 6 boys will earn Rs. 750.' The options are (A) 20 days, (B) 25 days, (C) 15 days, (D) 30 days. The instructor begins to solve the problem by setting up the first equation: 5M + 7B = 127.50 in 6 days, which simplifies to 5M + 7B = 21.25 per day.

  2. 2:00 – 5:00 02:00-05:00

    The instructor continues to solve the problem by setting up the second equation from the given data: 2M + 3B = 35 in 4 days, which simplifies to 2M + 3B = 8.75 per day. He then uses the method of elimination to solve for the individual daily earnings. He multiplies the first equation (5M + 7B = 21.25) by 2 to get 10M + 14B = 42.5, and the second equation (2M + 3B = 8.75) by 5 to get 10M + 15B = 43.75. By subtracting the first new equation from the second, he finds that B = 1.25. Substituting this value back, he finds M = 2.5. The instructor then calculates the daily earning of 7 men and 6 boys as 7(2.5) + 6(1.25) = 17.5 + 7.5 = 25.

  3. 5:00 – 6:23 05:00-06:23

    With the daily earning of 7 men and 6 boys established as Rs. 25, the instructor calculates the time required to earn Rs. 750. He sets up the equation: 25 * x = 750, where x is the number of days. Solving for x, he finds x = 750 / 25 = 30 days. The final answer is 30 days, which corresponds to option (D). The video concludes with a summary of the steps and a 'THANKS FOR WATCHING' screen.

The video presents a clear, step-by-step solution to a classic work and time problem. It demonstrates the method of setting up a system of linear equations based on given work rates and then solving for the unknown individual rates. The core concept is that the total work (earnings) is the product of the rate (daily earning) and the time. By first determining the individual daily earnings of a man and a boy, the solution can be extended to any combination of workers. The method of elimination is used effectively to solve the system of equations, and the final answer is derived by simple division of the total amount by the combined daily rate.

Loading lesson…