Stop and Wait Protocol

Duration: 3 min

This video lesson is available to enrolled students.

Return to /learn/COAL-INDIA-MANAGEMENT-TRAINEE/computer-networks-security/dll-flow-control/basics-delay-analysis/asset-stop-and-wait-protocol after enrolling

Inside: a video lesson and guided study material.

Module outline

  1. About Course: About the Course
  2. Paper-2 | Programming & Data Structures: C Fundamentals, Control Flow, Functions, Arrays & Pointers, Storage Classes, Structures & Enums, DMA, Macros, Scoping & File Handling, Introduction to DS, Array, Stack, Queue, Linked List, Tree, Graphs, Hashing
  3. Paper-2 | Databases / DBMS & SQL: Basics of DBMS, ER Diagram, Relational Model & Functional Dependencies, Keys & Integrity Constraints, Normalization (1NF - BCNF), Decomposition Properties & 4NF, File Organization & Indexing, Relational Algebra, SQL, Relational Calculus, Transaction Management, Concurrency Control
  4. Paper-2 | Algorithms: Algorithm Analysis, Time Complexity Analysis, Sorting Algorithms, Greedy Algorithms, Dynamic Programming, Minimum Spanning Trees, Shortest Path Algos
  5. Paper-2 | Computer Networks & Security: Introduction to CN, Data Communication, DLL: Access Control, DLL: Flow Control, DLL: Error Control, DLL: Framing, Data Link Layer - Ethernet, Net Layer: IPv4 & Proto, Net Layer: IP Addressing, Net Layer:Routing Protocol, Transport Layer Services, TL: Congestion & UDP, Application Layer, Hardware Basics, Network Access Technologies, Network Security
  6. Paper-2 | Digital Logic: Digital Systems & Boolean Basics, Logic Gates & Hardware, Boolean Expression, Boolean Minimization, Combinational Circuit, Sequential Circuits, Number System, Number Representation, Floating Point Rep, Registers and Counters, Boolean Algebra and Logic Gates, Microprocessors and Microcontrollers, Logic Families and CMOS Logic, Microprocessors, Logic Gates and Boolean Algebra, Number Systems and Codes, Minimization of Boolean Functions, Timing, Hazards and Testing, Logic Families, Combinational Logic Design, Arithmetic Circuits, Waveform Generators and Timer Circuits, Semiconductor Memories and Programmable Logic Devices, Combinational Logic Circuits, Sequential Circuits and State Machines, Latches and Flip-Flops, Finite State Machines, Minimization of Boolean Functions, Arithmetic Circuits, Registers and Counters, Latches and Flip-Flops, Number Systems and Codes
  7. Paper-2 | Operating System: Introduction to OS, Process Management, CPU Scheduling, Process Synchronization, Threads & Process Creation, Deadlock, Memory Management, Virtual Memory, Disc Scheduling, File Management
  8. Paper-2 | Theory of Computation: Introduction to TOC, Deterministic FA (DFA), Non-Deterministic FA, Regular Expressions, Grammar, Regular Language Properties, Moore & Mealy Machines, Pushdown Automata & CFG, Turing Machines
  9. Paper-2 | Computer Organization & Architecture: Basics of COA, Cache Memory Organization, Input Output Organisation, Pipelining, Instr Formats & Modes, Control Unit Design, Programming the Basic Computer, Semiconductor Memories and Programmable Logic, Processor Organization and Instructions, Memory Hierarchy and Input/Output
  10. Paper-2 | Compiler Design: Intro to Compilers, Lexical Analysis, Grammar & CFG, Syntax Analysis: Top-Down, Syntax Analysis: Bottom-Up, Semantic Analysis & SDT, Intermediate Code Gen, Code Optimization, Run Time Environment
  11. Paper-1 | General Awareness: Polity, Physics, Biology, Chemistry, Static General Knowledge, GK- Current Affairs, History, Geography, Indian Economy, Environment
  12. Paper-1 | Logical Reasoning: Series (Number and Letter Series) (Numerical Relations and Reasoning), Coding Decoding, Non Verbal Reasoning (Spatial Aptitude) (Spatial Reasoning) (Visual Reasoning), Data Interpretation, Blood Relations, Syllogisms, Deductive and Inductive Reasoning (Logical Deduction and Induction) (Prepositional Reasoning), Selection Decision Table (Decision Making), Clock, Calendar, Cubes & Dices, Directions (Direction Test), Analogy, Seating Arrangements, Analytical Reasoning (Counting Figures Reasoning), Alphabet and Word Tests, Numerical Reasoning, Number System, Averages, Mixtures and Alligation, Percentages, Series Completion, Analogy and Classification, Patterns in Two-Dimensional Figures, Coding and Decoding, Mathematical Operations, Data Sufficiency, Direction Sense, Assembling and Grouping of Shapes, Transformation of Shapes, Three-Dimensional Patterns and Visualization, Cubes and Dice, Vocabulary, Statistics, Algebra, Geometry, Permutations and Combinations, Logical Deduction and Induction, Syllogisms and Venn Diagrams, Critical Reasoning, Order, Ranking and Sequence, Reading Comprehension, Speed, Time and Distance, Narrative Sequencing, Project Monitoring, Resources and Safety, Profit, Loss and Discount, Constraint Puzzles, Clocks and Calendars, Traverse Surveying, Simplification and Approximation, Blood Relations, Data Interpretation, Venn Diagram
  13. Paper-1 | Quantitative Aptitude: Ratio and Proportion (Ratios), Mixture and Alligation, Permutation and Combination, Number System, HCF LCM, Speed Time and Distance, Average, Age Problems, Percentage, Profit and Loss, Pipe and Cistern, Simple Interest and Compound Interest, Powers and Exponents (Surds and Indices), Mensuration and Geometry, Probability, Statistics, Arithmetic, Algebra, Ratio and Proportion, Subject-Verb Agreement, Sentence Completion, Powers, Surds and Logarithms, Data Interpretation, Sequences and Series, Trigonometry, Mensuration, Measurement and Quantity Take-Off, Signal Space and Optimum Detection, Time and Work, Probability, Algebra, Speed, Time and Distance, Statistics, Sequence and Series (Series), Combinatorics
  14. Paper-1 | English: Vocabulary, Comprehension / Reading Comprehension / Unseen Passages (Critical Reasoning) (Paragraph Questions), Sentence Re-arrangements (Para Jumbles) (Narrative Sequencing), Sentence Correction (Error Correction), Cloze Test (Cloze Passage), Prepositions and Conjunctions, Idioms and Phrases, Verb Forms and Verb Patterns, Sentence Structure and Correction, Modals, Conditionals and Subjunctive, Tenses, Adjectives and Adverbs, Sentence Basics, Nouns and Pronouns, Voice and Reported Speech, Articles and Determiners, Vocabulary
  15. Coal India Previous Year Paper:
  16. Engineering Mathematics: Set Theory, Relations, Functions, Graph Theory, Group Theory, Propositional and Predicate Logic, Linear Algebra, Calculus
  17. Coal India Mock Test:
AI summary & chapters

AI Summary

An AI-generated summary of this video lecture.

This lecture introduces the Stop-and-Wait Protocol as a fundamental flow control mechanism in data communication. The instructor begins by establishing the problem of receiver overload, explaining that if frames arrive faster than they can be processed, storage becomes an issue. The core definition is presented: the sender transmits a single frame and then stops, waiting for an acknowledgment (ACK) from the receiver before proceeding. A timing diagram visually demonstrates this sequential exchange between Sender A and Receiver B, showing blue Frame blocks followed by orange ACK blocks. The instructor highlights the unidirectional nature of data transmission versus the auxiliary role of ACK tokens, emphasizing that this protocol effectively prevents buffer overflow by forcing the sender to slow down until confirmation is received.

Chapters

  1. 0:00 – 2:00 00:00-02:00

    The lecture opens with the title "Stop-and-Wait Protocol" displayed on a whiteboard alongside numbered text points. The instructor explains the necessity of flow control, noting that if data frames arrive at the receiver site faster than they can be processed, storage is required. Visible text states that normally receivers do not have enough space to store these frames. To prevent the receiver from becoming overwhelmed, a mechanism is needed to tell the sender to slow down. The instructor defines the protocol explicitly: "The sender sends one frame, stops until it receives confirmation from the receiver... and then sends the next frame." A diagram begins to appear illustrating the sequence of Frames and ACKs traveling between Sender A and Receiver B over time, with the instructor gesturing towards the text to highlight specific steps.

  2. 2:00 – 3:22 02:00-03:22

    The instructor elaborates on the timing diagram, which depicts Sender A and Receiver B exchanging blue "Frame" blocks and orange "ACK" blocks. Handwritten annotations like "RTT" appear on the timeline at the bottom of the diagram to indicate Round Trip Time. The visual aid emphasizes that while data frames are unidirectional, auxiliary ACK frames act as simple tokens of acknowledgment. The instructor gestures towards the sequence diagram to reinforce that the sender must wait for confirmation before transmitting subsequent data. This section solidifies the concept that flow control is achieved by stopping transmission after each frame until an acknowledgment confirms successful receipt, ensuring the receiver is not overwhelmed.

The Stop-and-Wait Protocol serves as a basic flow control method where the sender transmits one frame and waits for an acknowledgment before sending the next. This approach addresses the issue of receiver buffer overflow by ensuring that frames are not sent faster than they can be processed. The timing diagram clearly shows the alternating sequence of Frames and ACKs, with annotations like RTT indicating the time taken for a round trip. The protocol relies on unidirectional data flow supplemented by auxiliary ACK tokens, creating a simple yet effective mechanism for managing communication speed between Sender A and Receiver B.

Loading lesson…