Stop and Wait Protocol

Duration: 3 min

This video lesson is available to enrolled students.

Return to /learn/CDAC-C-CAT-COMPLETE-PREPARATION/section-b-networking/dll-flow-control/basics-delay-analysis/asset-stop-and-wait-protocol after enrolling

Inside: a video lesson and guided study material.

Module outline

  1. Section A | English: Vocabulary, Comprehension / Reading Comprehension / Unseen Passages (Critical Reasoning) (Paragraph Questions), Preposition, Sentence Correction (Error Correction), Sentence Completion (Fill in the blanks), Articles, Sentence Re-arrangements (Para Jumbles) (Narrative Sequencing), Verbal Analogy (Word Based Analogy)
  2. Section A | Quant Aptitude: Ratio and Proportion (Ratios), Mixture and Alligation, Permutation and Combination, Number System, HCF LCM, Sequence and Series (Series), Speed Time and Distance, Arithmetic, Algebra, Powers and Exponents (Surds and Indices), Average, Age Problems, Percentage, Profit and Loss, Partnership, Time and Work, Simple Interest and Compound Interest, Mensuration and Geometry, Probability, Pipe and Cistern
  3. Section A | Reasoning: Series (Number and Letter Series) (Numerical Relations and Reasoning), Coding Decoding, Data Sufficiency, Calendar, Clock, Blood Relations, Directions (Direction Test), Seating Arrangements, Ranking, Order and Sequence, Puzzle Solving (Puzzles)
  4. Section B | C Programming: C Programming by Yash Sir, Coding Questions by Yash Sir
  5. Section B | Data Structures: Algorithm Analysis, Greedy Algorithms, Time Complexity Analysis, Sorting Algorithms, Introduction to DS, Array, Stack, Queue, Linked List, Tree, Graphs
  6. Section B | OOP (C++): Object Oriented Programming (OOPS), Programming in C++
  7. Section B | OS: Introduction to OS, Process Management, CPU Scheduling, Process Synchronization, Threads & Process Creation, Deadlock, Memory Management, Virtual Memory, Disc Scheduling, File Management, Windows OS
  8. Section B | Networking: Introduction to CN, Data Communication, DLL: Access Control, DLL: Flow Control, DLL: Error Control, DLL: Framing, Data Link Layer - Ethernet, Net Layer: IPv4 & Proto, Net Layer: IP Addressing, Net Layer:Routing Protocol, Transport Layer Services, TL: Congestion & UDP, Application Layer, Hardware basics
  9. Section B | AI & Big Data Basics: AI & ML by Arun Sir, Big Data Systems
  10. Section C | Digital Electronics: Digital Systems & Boolean Basics, Logic Gates & Hardware, Boolean Expression, Boolean Minimization, Combinational Circuit, Sequential Circuits, Number System, Number Representation, Analog-Digital Conversion
  11. Section A, C | Comp. Fundamentals, COA: Basics of COA, Floating Point Rep, Cache Memory Organization, Input Output Organisation, Pipelining, Instr Formats & Modes, Control Unit Design, Register Transfer and Microoperations, Multiprocessors, Programming the Basic Computer
  12. MOCK TEST:
AI summary & chapters

AI Summary

An AI-generated summary of this video lecture.

This lecture introduces the Stop-and-Wait Protocol as a fundamental flow control mechanism in data communication. The instructor begins by establishing the problem of receiver overload, explaining that if frames arrive faster than they can be processed, storage becomes an issue. The core definition is presented: the sender transmits a single frame and then stops, waiting for an acknowledgment (ACK) from the receiver before proceeding. A timing diagram visually demonstrates this sequential exchange between Sender A and Receiver B, showing blue Frame blocks followed by orange ACK blocks. The instructor highlights the unidirectional nature of data transmission versus the auxiliary role of ACK tokens, emphasizing that this protocol effectively prevents buffer overflow by forcing the sender to slow down until confirmation is received.

Chapters

  1. 0:00 – 2:00 00:00-02:00

    The lecture opens with the title "Stop-and-Wait Protocol" displayed on a whiteboard alongside numbered text points. The instructor explains the necessity of flow control, noting that if data frames arrive at the receiver site faster than they can be processed, storage is required. Visible text states that normally receivers do not have enough space to store these frames. To prevent the receiver from becoming overwhelmed, a mechanism is needed to tell the sender to slow down. The instructor defines the protocol explicitly: "The sender sends one frame, stops until it receives confirmation from the receiver... and then sends the next frame." A diagram begins to appear illustrating the sequence of Frames and ACKs traveling between Sender A and Receiver B over time, with the instructor gesturing towards the text to highlight specific steps.

  2. 2:00 – 3:22 02:00-03:22

    The instructor elaborates on the timing diagram, which depicts Sender A and Receiver B exchanging blue "Frame" blocks and orange "ACK" blocks. Handwritten annotations like "RTT" appear on the timeline at the bottom of the diagram to indicate Round Trip Time. The visual aid emphasizes that while data frames are unidirectional, auxiliary ACK frames act as simple tokens of acknowledgment. The instructor gestures towards the sequence diagram to reinforce that the sender must wait for confirmation before transmitting subsequent data. This section solidifies the concept that flow control is achieved by stopping transmission after each frame until an acknowledgment confirms successful receipt, ensuring the receiver is not overwhelmed.

The Stop-and-Wait Protocol serves as a basic flow control method where the sender transmits one frame and waits for an acknowledgment before sending the next. This approach addresses the issue of receiver buffer overflow by ensuring that frames are not sent faster than they can be processed. The timing diagram clearly shows the alternating sequence of Frames and ACKs, with annotations like RTT indicating the time taken for a round trip. The protocol relies on unidirectional data flow supplemented by auxiliary ACK tokens, creating a simple yet effective mechanism for managing communication speed between Sender A and Receiver B.

Loading lesson…