The SRS document produced at the end of requirement analysis and specification…

DSSSB 2021

The SRS document produced at the end of requirement analysis and specification is known as _____.

  1. A.

    White-box specification

  2. B.

    Black-box specification

  3. C.

    Design plan

  4. D.

    Architectural design

Attempted by 1711 students.

Sign up free to check your answer

Sign up free

Explore the full course: Bpsc

Loading lesson…