Stop and Wait Protocol

Duration: 3 min

This video lesson is available to enrolled students.

Return to /learn/BIHAR-STET-COMPUTER-SCIENCE-COMPLETE-COURSE/unit-7-computer-networks/dll-flow-control/basics-delay-analysis/asset-stop-and-wait-protocol after enrolling

Inside: a video lesson and guided study material.

Module outline

  1. About the course: About the Course
  2. Mathematical Aptitude: संख्या पद्धति / Number System, महत्तम समापवर्तक और लघुत्तम समापवर्त्य / HCF and LCM, Divisibility Rules, प्रतिशत / Percentage, अनुपात और समानुपात / Ratio and Proportion, औसत / Average, लाभ, हानि और बट्टा / Profit, Loss and Discount, समय और कार्य / Time and Work, घन क्षेत्रमिति / Solid Mensuration, साधारण और चक्रवृद्धि ब्याज / Simple and Compound Interest, समय, चाल और दूरी / Time, Speed and Distance, Age Problems, मिश्रण और एलिगेशन / Mixture and Alligation, Algebra, सरलीकरण, घातांक और करणी / Simplification, Indices and Surds, Pipe and Cistern, Trigonometry, Statistics, आँकड़ा निर्वचन / Data Interpretation, Arithmetic, समुच्चय, संबंध, फलन और विविक्त गणित / Sets, Relations, Functions and Discrete Mathematics, संख्या पद्धति और संख्या सिद्धांत / Number Systems and Number Theory, निर्देशांक ज्यामिति, सदिश और त्रिविमीय ज्यामिति / Coordinate Geometry, Vectors and 3D Geometry, बहुपद, समीकरण और सम्मिश्र संख्याएँ / Polynomials, Equations and Complex Numbers
  3. Logical Reasoning: श्रेणी / Series, कूट लेखन एवं कूट वाचन / Coding-Decoding, सादृश्यता एवं वर्गीकरण / Analogy and Classification, रक्त संबंध / Blood Relations, दिशा एवं दूरी / Direction and Distance, क्रम एवं रैंकिंग / Order and Ranking, अशाब्दिक तर्क / Non-Verbal Reasoning, बैठक व्यवस्था एवं पहेलियाँ / Seating Arrangement and Puzzles, Syllogisms, वेन आरेख, न्याय वाक्य एवं असमानता / Venn Diagrams, Syllogism and Inequalities, गणितीय संक्रियाएँ एवं लुप्त संख्या / Mathematical Operations and Missing Numbers, वर्णमाला एवं संख्या परीक्षण / Alphabet and Number Test, कथन आधारित तार्किक विवेचन / Statement-Based Reasoning, Analytical Reasoning (Counting Figures Reasoning), घन, पासा एवं आकृतियों की गिनती / Cubes, Dice and Figure Counting, कैलेंडर एवं घड़ी / Calendar and Clock, Clock
  4. General Knowledge: वैज्ञानिक उपलब्धियाँ और अनुसंधान / Scientific Achievements and Research, Chemistry, Biology, History, Geography, Polity, Indian Economy, समसामयिकी / Current Affairs, Static General Knowledge, राज्य विशेष सामान्य ज्ञान / State-Specific General Knowledge
  5. Art of Teaching: शिक्षण-अधिगम प्रक्रिया एवं कक्षा प्रबंधन / Teaching-Learning Process and Classroom Management, Learners & Learning Process, Factors Affecting Teaching, शिक्षण विधियाँ एवं उपागम / Teaching Methods and Approaches, सूक्ष्म शिक्षण एवं कक्षा संप्रेषण / Microteaching and Classroom Communication, शिक्षण सहायक सामग्री एवं शैक्षिक तकनीकी / Teaching Aids and Educational Technology, आकलन एवं मूल्यांकन / Assessment and Evaluation, शिक्षक: गुण, व्यावसायिक नैतिकता एवं विकास / Teacher: Qualities, Professional Ethics and Development, शैक्षिक नीतियाँ, अधिनियम एवं प्रशासन / Educational Policies, Acts and Administration, पाठ्यचर्या, कला एवं सह-शैक्षिक क्षेत्र / Curriculum, Arts and Co-curricular Areas, निर्देशन एवं परामर्श / Guidance and Counselling, दिव्यांग बच्चों की शिक्षा / Education of Children with Disabilities, Micro-Teaching & Teaching Skills, पाठ योजना / Lesson Planning
  6. Environmental Science: Environment
  7. Unit 1 | Digital Electronics: Digital Systems & Boolean Basics, Logic Gates & Hardware, Boolean Expression, Boolean Minimization, Combinational Circuit, Sequential Circuits, Number System, Number Representation
  8. Unit 2 | COA: Basics of COA, Floating Point Rep, Cache Memory Organization, Input Output Organisation, Instr Formats & Modes, Control Unit Design, Register Transfer and Microoperations, Programming the Basic Computer
  9. Unit 3 | C Programming: C Fundamentals, Control Flow, Functions, Arrays & Pointers, Storage Classes, Structures & Enums, DMA, Macros, Scoping & File Handling
  10. Unit 3 | Data Structures: Introduction to DS, Array, Stack, Queue, Linked List, Tree, Graphs, Hashing
  11. Unit 4 | Algorithms: Algorithm Analysis, Time Complexity Analysis, Sorting Algorithms, Dynamic Programming, Minimum Spanning Trees, Shortest Path Algos, Advanced Algorithms
  12. Unit 5 | Operating System: Introduction to OS, Process Management, CPU Scheduling, Process Synchronization, Threads & Process Creation, Deadlock, Memory Management, Virtual Memory, Disc Scheduling, File Management
  13. Unit 6 | Database Management System: Basics of DBMS, ER Diagram, Relational Model & Functional Dependencies, Keys & Integrity Constraints, Normalization (1NF - BCNF), Decomposition Properties & 4NF, File Organization & Indexing, Relational Algebra, SQL, Transaction Management, Concurrency Control
  14. Unit 7 | Computer Networks: Introduction to CN, Data Communication, DLL: Access Control, DLL: Flow Control, DLL: Error Control, DLL: Framing, Data Link Layer - Ethernet, Net Layer: IPv4 & Proto, Net Layer: IP Addressing, Net Layer:Routing Protocol, Transport Layer Services, TL: Congestion & UDP, Application Layer
  15. Unit 8 | Software Engineering: Fundamentals of Software Engineering, Software Requirements and Quality Assurance, Software Design, Estimation and Metrics, Software Testing, Software Maintenance and Configuration Management
  16. Unit 9 | Object Oriented Programming: OOPS with C++
  17. Unit 10 | Web Development: HTML Basics, CSS, JavaScript-Basics, XML, Node.js, Git & Github, PHP
  18. Unit 11 | Theory Of Computation: Introduction to TOC, Deterministic FA (DFA), Non-Deterministic FA, Regular Expressions, Grammar, Regular Language Properties, Moore & Mealy Machines, Pushdown Automata & CFG, Turing Machines
  19. Unit 12 | IoT: Emerging Tech Trends, Cloud Computing, कंप्यूटर नेटवर्क / Computer Networks
  20. Unit 13 | Artificial Intelligence: Approaches to AI, Search Algorithms, Game Playing, Knowledge Representation, Natural Language Processing, Artificial Neural Networks, Genetic Algorithms
  21. Unit 14 | E-Commerce: Electronic Data Interchange and E-Commerce, Role of Internet and Web Services, Security in Mobile and Wireless Computing, Physical Security and Cryptography Basics, Cyber Safety and Security
  22. Unit 15 | Multimedia: Multimedia
  23. Unit 16 | Python: Introduction to Python, Tokens, Variables, Data Types, I/O, Operators & Expressions, Control Flow & Looping, Collections & Strings, Functions & Modules, File Handling & Data Analysis, DSA using Python
  24. Full Length Mock Tests — General Paper:
  25. Full Length Mock Tests — Computer Science (Paper II):
AI summary & chapters

AI Summary

An AI-generated summary of this video lecture.

This lecture introduces the Stop-and-Wait Protocol as a fundamental flow control mechanism in data communication. The instructor begins by establishing the problem of receiver overload, explaining that if frames arrive faster than they can be processed, storage becomes an issue. The core definition is presented: the sender transmits a single frame and then stops, waiting for an acknowledgment (ACK) from the receiver before proceeding. A timing diagram visually demonstrates this sequential exchange between Sender A and Receiver B, showing blue Frame blocks followed by orange ACK blocks. The instructor highlights the unidirectional nature of data transmission versus the auxiliary role of ACK tokens, emphasizing that this protocol effectively prevents buffer overflow by forcing the sender to slow down until confirmation is received.

Chapters

  1. 0:00 – 2:00 00:00-02:00

    The lecture opens with the title "Stop-and-Wait Protocol" displayed on a whiteboard alongside numbered text points. The instructor explains the necessity of flow control, noting that if data frames arrive at the receiver site faster than they can be processed, storage is required. Visible text states that normally receivers do not have enough space to store these frames. To prevent the receiver from becoming overwhelmed, a mechanism is needed to tell the sender to slow down. The instructor defines the protocol explicitly: "The sender sends one frame, stops until it receives confirmation from the receiver... and then sends the next frame." A diagram begins to appear illustrating the sequence of Frames and ACKs traveling between Sender A and Receiver B over time, with the instructor gesturing towards the text to highlight specific steps.

  2. 2:00 – 3:22 02:00-03:22

    The instructor elaborates on the timing diagram, which depicts Sender A and Receiver B exchanging blue "Frame" blocks and orange "ACK" blocks. Handwritten annotations like "RTT" appear on the timeline at the bottom of the diagram to indicate Round Trip Time. The visual aid emphasizes that while data frames are unidirectional, auxiliary ACK frames act as simple tokens of acknowledgment. The instructor gestures towards the sequence diagram to reinforce that the sender must wait for confirmation before transmitting subsequent data. This section solidifies the concept that flow control is achieved by stopping transmission after each frame until an acknowledgment confirms successful receipt, ensuring the receiver is not overwhelmed.

The Stop-and-Wait Protocol serves as a basic flow control method where the sender transmits one frame and waits for an acknowledgment before sending the next. This approach addresses the issue of receiver buffer overflow by ensuring that frames are not sent faster than they can be processed. The timing diagram clearly shows the alternating sequence of Frames and ACKs, with annotations like RTT indicating the time taken for a round trip. The protocol relies on unidirectional data flow supplemented by auxiliary ACK tokens, creating a simple yet effective mechanism for managing communication speed between Sender A and Receiver B.

Loading lesson…