Basics and Delay Analysis

This PDF lesson is available to enrolled students.

Return to /learn/BIHAR-STET-COMPUTER-SCIENCE-COMPLETE-COURSE/unit-7-computer-networks/dll-flow-control/basics-delay-analysis/asset-basics-and-delay-analysis-19283 after enrolling

Inside: notes and a PDF lesson.

Module outline

  1. About the course: About the Course
  2. Mathematical Aptitude: संख्या पद्धति / Number System, महत्तम समापवर्तक और लघुत्तम समापवर्त्य / HCF and LCM, Divisibility Rules, प्रतिशत / Percentage, अनुपात और समानुपात / Ratio and Proportion, औसत / Average, लाभ, हानि और बट्टा / Profit, Loss and Discount, समय और कार्य / Time and Work, घन क्षेत्रमिति / Solid Mensuration, साधारण और चक्रवृद्धि ब्याज / Simple and Compound Interest, समय, चाल और दूरी / Time, Speed and Distance, Age Problems, मिश्रण और एलिगेशन / Mixture and Alligation, Algebra, सरलीकरण, घातांक और करणी / Simplification, Indices and Surds, Pipe and Cistern, Trigonometry, Statistics, आँकड़ा निर्वचन / Data Interpretation, Arithmetic, समुच्चय, संबंध, फलन और विविक्त गणित / Sets, Relations, Functions and Discrete Mathematics, संख्या पद्धति और संख्या सिद्धांत / Number Systems and Number Theory, निर्देशांक ज्यामिति, सदिश और त्रिविमीय ज्यामिति / Coordinate Geometry, Vectors and 3D Geometry, बहुपद, समीकरण और सम्मिश्र संख्याएँ / Polynomials, Equations and Complex Numbers
  3. Logical Reasoning: श्रेणी / Series, कूट लेखन एवं कूट वाचन / Coding-Decoding, सादृश्यता एवं वर्गीकरण / Analogy and Classification, रक्त संबंध / Blood Relations, दिशा एवं दूरी / Direction and Distance, क्रम एवं रैंकिंग / Order and Ranking, अशाब्दिक तर्क / Non-Verbal Reasoning, बैठक व्यवस्था एवं पहेलियाँ / Seating Arrangement and Puzzles, Syllogisms, वेन आरेख, न्याय वाक्य एवं असमानता / Venn Diagrams, Syllogism and Inequalities, गणितीय संक्रियाएँ एवं लुप्त संख्या / Mathematical Operations and Missing Numbers, वर्णमाला एवं संख्या परीक्षण / Alphabet and Number Test, कथन आधारित तार्किक विवेचन / Statement-Based Reasoning, Analytical Reasoning (Counting Figures Reasoning), घन, पासा एवं आकृतियों की गिनती / Cubes, Dice and Figure Counting, कैलेंडर एवं घड़ी / Calendar and Clock, Clock
  4. General Knowledge: वैज्ञानिक उपलब्धियाँ और अनुसंधान / Scientific Achievements and Research, Chemistry, Biology, History, Geography, Polity, Indian Economy, समसामयिकी / Current Affairs, Static General Knowledge, राज्य विशेष सामान्य ज्ञान / State-Specific General Knowledge
  5. Art of Teaching: शिक्षण-अधिगम प्रक्रिया एवं कक्षा प्रबंधन / Teaching-Learning Process and Classroom Management, Learners & Learning Process, Factors Affecting Teaching, शिक्षण विधियाँ एवं उपागम / Teaching Methods and Approaches, सूक्ष्म शिक्षण एवं कक्षा संप्रेषण / Microteaching and Classroom Communication, शिक्षण सहायक सामग्री एवं शैक्षिक तकनीकी / Teaching Aids and Educational Technology, आकलन एवं मूल्यांकन / Assessment and Evaluation, शिक्षक: गुण, व्यावसायिक नैतिकता एवं विकास / Teacher: Qualities, Professional Ethics and Development, शैक्षिक नीतियाँ, अधिनियम एवं प्रशासन / Educational Policies, Acts and Administration, पाठ्यचर्या, कला एवं सह-शैक्षिक क्षेत्र / Curriculum, Arts and Co-curricular Areas, निर्देशन एवं परामर्श / Guidance and Counselling, दिव्यांग बच्चों की शिक्षा / Education of Children with Disabilities, Micro-Teaching & Teaching Skills, पाठ योजना / Lesson Planning
  6. Environmental Science: Environment
  7. Unit 1 | Digital Electronics: Digital Systems & Boolean Basics, Logic Gates & Hardware, Boolean Expression, Boolean Minimization, Combinational Circuit, Sequential Circuits, Number System, Number Representation
  8. Unit 2 | COA: Basics of COA, Floating Point Rep, Cache Memory Organization, Input Output Organisation, Instr Formats & Modes, Control Unit Design, Register Transfer and Microoperations, Programming the Basic Computer
  9. Unit 3 | C Programming: C Fundamentals, Control Flow, Functions, Arrays & Pointers, Storage Classes, Structures & Enums, DMA, Macros, Scoping & File Handling
  10. Unit 3 | Data Structures: Introduction to DS, Array, Stack, Queue, Linked List, Tree, Graphs, Hashing
  11. Unit 4 | Algorithms: Algorithm Analysis, Time Complexity Analysis, Sorting Algorithms, Dynamic Programming, Minimum Spanning Trees, Shortest Path Algos, Advanced Algorithms
  12. Unit 5 | Operating System: Introduction to OS, Process Management, CPU Scheduling, Process Synchronization, Threads & Process Creation, Deadlock, Memory Management, Virtual Memory, Disc Scheduling, File Management
  13. Unit 6 | Database Management System: Basics of DBMS, ER Diagram, Relational Model & Functional Dependencies, Keys & Integrity Constraints, Normalization (1NF - BCNF), Decomposition Properties & 4NF, File Organization & Indexing, Relational Algebra, SQL, Transaction Management, Concurrency Control
  14. Unit 7 | Computer Networks: Introduction to CN, Data Communication, DLL: Access Control, DLL: Flow Control, DLL: Error Control, DLL: Framing, Data Link Layer - Ethernet, Net Layer: IPv4 & Proto, Net Layer: IP Addressing, Net Layer:Routing Protocol, Transport Layer Services, TL: Congestion & UDP, Application Layer
  15. Unit 8 | Software Engineering: Fundamentals of Software Engineering, Software Requirements and Quality Assurance, Software Design, Estimation and Metrics, Software Testing, Software Maintenance and Configuration Management
  16. Unit 9 | Object Oriented Programming: OOPS with C++
  17. Unit 10 | Web Development: HTML Basics, CSS, JavaScript-Basics, XML, Node.js, Git & Github, PHP
  18. Unit 11 | Theory Of Computation: Introduction to TOC, Deterministic FA (DFA), Non-Deterministic FA, Regular Expressions, Grammar, Regular Language Properties, Moore & Mealy Machines, Pushdown Automata & CFG, Turing Machines
  19. Unit 12 | IoT: Emerging Tech Trends, Cloud Computing, कंप्यूटर नेटवर्क / Computer Networks, Internet of Things
  20. Unit 13 | Artificial Intelligence: Approaches to AI, Search Algorithms, Game Playing, Knowledge Representation, Natural Language Processing, Artificial Neural Networks, Genetic Algorithms
  21. Unit 14 | E-Commerce: Electronic Data Interchange and E-Commerce, Role of Internet and Web Services, Security in Mobile and Wireless Computing, Physical Security and Cryptography Basics, Cyber Safety and Security
  22. Unit 15 | Multimedia: Multimedia
  23. Unit 16 | Python: Introduction to Python, Tokens, Variables, Data Types, I/O, Operators & Expressions, Control Flow & Looping, Collections & Strings, Functions & Modules, File Handling & Data Analysis, DSA using Python
  24. Full Length Mock Tests — General Paper:
  25. Full Length Mock Tests — Computer Science (Paper II):
  26. Full Length Mock Test – General + Computer Science:
Loading lesson…