Efficiency & Alterate Days Problem (2)

Duration: 6 min

This video lesson is available to enrolled students.

Return to /learn/ASRB-ICAR-T3-T4-INFORMATION-TECHNOLOGY-PRELIMS-MAINS/quantitative-aptitude/time-and-work/alternate-days-remaining-work-problems/asset-efficiency-alterate-days-problem-2 after enrolling

Inside: a video lesson and guided study material.

Module outline

  1. Prelims: General Knowledge: Physics Chemistry Biology History Geography Polity Indian Economy Static General Knowledge GK- Current Affairs Environment
  2. Prelims: General English: Vocabulary Noun Pronoun Adjectives Preposition Articles Direct and Indirect Speech Tenses Conjunction Subject Verb Agreement (Verb Noun Agreement) Modals Sentence Re-arrangements (Para Jumbles) (Narrative Sequencing) Sentence Correction (Error Correction) Sentence Completion (Fill in the blanks) Comprehension / Reading Comprehension / Unseen Passages (Critical Reasoning) (Paragraph Questions) Cloze Test (Cloze Passage) Verbal Analogy (Word Based Analogy) Sentence Construction Adverb Verb
  3. Prelims: Quantitative Aptitude: Percentage Ratio and Proportion (Ratios) HCF LCM Divisibility Rules Average Sequence and Series (Series) Number System Powers and Exponents (Surds and Indices) Algebra Profit and Loss Simple Interest and Compound Interest Time and Work Pipe and Cistern Speed Time and Distance Mixture and Alligation Mensuration and Geometry Age Problems Partnership Statistics Data Interpretation Arithmetic
  4. Prelims: General Agriculture: Agriculture in India and Tripura Natural Resource Management Fundamentals of Crop Production Horticulture Crop Improvement Crop Protection Social Science
  5. IT Mains: Operating System: Introduction to OS Process Management CPU Scheduling Process Synchronization Threads & Process Creation Deadlock Memory Management Virtual Memory Disc Scheduling File Management Distributed Systems
  6. IT Mains: Computer Networking: Introduction to CN DLL: Access Control DLL: Flow Control DLL: Error Control Data Link Layer - Ethernet Net Layer: IPv4 & Proto Net Layer: IP Addressing Net Layer:Routing Protocol Transport Layer Services TL: Congestion & UDP Application Layer Hardware Basics Network Security
  7. IT Mains: DBMS: Basics of DBMS ER Diagram Relational Model & Functional Dependencies Keys & Integrity Constraints Normalization (1NF - BCNF) Decomposition Properties & 4NF Relational Algebra SQL Relational Calculus Transaction Management Concurrency Control Database Recovery Big Data Systems Database Security & Authorization Enhanced Data Models NoSQL
  8. IT Mains: Software Engineering: Fundamentals of Software Engineering Software Requirements and Quality Assurance Software Design, Estimation and Metrics Software Testing Software Maintenance and Configuration Management
  9. IT Mains: Data Structures & Algorithms: Introduction to DS Array Stack Queue Linked List Tree Graphs Hashing Algorithm Analysis Time Complexity Analysis Sorting Algorithms
  10. IT Mains: OOPS with C++ & Java: C Fundamentals OOPS with C++ Java Fundamentals Array, String, IO & References OOPS with Java Generic & Collections Multithreading File Handling & I/O
  11. IT Mains: Python: Introduction to Python Tokens, Variables, Data Types, I/O Operators & Expressions Control Flow & Looping Collections & Strings Functions & Modules
  12. IT Mains: Website Development: Website, Browser & Services Internet Fundamentals Web Design & Development Protocols & Services Web Publishing & Hosting Server Side & Security Emerging Technologies HTML Basics HTML5 CSS JavaScript-Basics .Net Programming PHP
  13. IT Mains: Mobile App Development: Mobile Computing Multimedia
  14. IT Mains: Linux / Windows Server Admin: Unix OS Linux OS
AI summary & chapters

AI Summary

An AI-generated summary of this video lecture.

This video is a tutorial on solving a work and time problem involving the earnings of men and boys. The instructor, Yash Jain Sir, presents a question where the earnings of 5 men and 7 boys in 6 days and 2 men and 3 boys in 4 days are given, and the task is to find the time for 7 men and 6 boys to earn Rs. 750. The solution method involves setting up equations for the daily earnings of a man (M) and a boy (B), using the given data to find the individual daily earnings, and then calculating the total time required. The video uses a step-by-step approach, first finding the daily earning of a man and a boy, and then applying these values to the final scenario.

Chapters

  1. 0:00 – 2:00 00:00-02:00

    The video opens with a title card for a 'TIME & WORK' lesson, followed by a screen showing a multiple-choice question (Q1) about the earnings of men and boys. The instructor, Yash Jain Sir, introduces the problem: 'If 5 men with 7 boys can earn Rs. 127.50 in 6 days and 2 men with 3 boys can earn Rs. 35 in 4 days, then find the time in which 7 men with 6 boys will earn Rs. 750.' The options are (A) 20 days, (B) 25 days, (C) 15 days, (D) 30 days. The instructor begins to solve the problem by setting up the first equation: 5M + 7B = 127.50 in 6 days, which simplifies to 5M + 7B = 21.25 per day.

  2. 2:00 – 5:00 02:00-05:00

    The instructor continues to solve the problem by setting up the second equation from the given data: 2M + 3B = 35 in 4 days, which simplifies to 2M + 3B = 8.75 per day. He then uses the method of elimination to solve for the individual daily earnings. He multiplies the first equation (5M + 7B = 21.25) by 2 to get 10M + 14B = 42.5, and the second equation (2M + 3B = 8.75) by 5 to get 10M + 15B = 43.75. By subtracting the first new equation from the second, he finds that B = 1.25. Substituting this value back, he finds M = 2.5. The instructor then calculates the daily earning of 7 men and 6 boys as 7(2.5) + 6(1.25) = 17.5 + 7.5 = 25.

  3. 5:00 – 6:23 05:00-06:23

    With the daily earning of 7 men and 6 boys established as Rs. 25, the instructor calculates the time required to earn Rs. 750. He sets up the equation: 25 * x = 750, where x is the number of days. Solving for x, he finds x = 750 / 25 = 30 days. The final answer is 30 days, which corresponds to option (D). The video concludes with a summary of the steps and a 'THANKS FOR WATCHING' screen.

The video presents a clear, step-by-step solution to a classic work and time problem. It demonstrates the method of setting up a system of linear equations based on given work rates and then solving for the unknown individual rates. The core concept is that the total work (earnings) is the product of the rate (daily earning) and the time. By first determining the individual daily earnings of a man and a boy, the solution can be extended to any combination of workers. The method of elimination is used effectively to solve the system of equations, and the final answer is derived by simple division of the total amount by the combined daily rate.

Loading lesson…