Round Robin PQ

Duration: 13 min

This video lesson is available to enrolled students.

Return to /learn/ASRB-ICAR-T3-T4-INFORMATION-TECHNOLOGY-PRELIMS-MAINS/operating-system/cpu-scheduling/round-robin-scheduling/asset-round-robin-pq after enrolling

Inside: a video lesson and guided study material.

Module outline

  1. Prelims: General Knowledge: Physics Chemistry Biology History Geography Polity Indian Economy Static General Knowledge GK- Current Affairs Environment
  2. Prelims: General English: Vocabulary Noun Pronoun Adjectives Preposition Articles Direct and Indirect Speech Tenses Conjunction Subject Verb Agreement (Verb Noun Agreement) Modals Sentence Re-arrangements (Para Jumbles) (Narrative Sequencing) Sentence Correction (Error Correction) Sentence Completion (Fill in the blanks) Comprehension / Reading Comprehension / Unseen Passages (Critical Reasoning) (Paragraph Questions) Cloze Test (Cloze Passage) Verbal Analogy (Word Based Analogy) Sentence Construction Adverb Verb
  3. Prelims: Quantitative Aptitude: Percentage Ratio and Proportion (Ratios) HCF LCM Divisibility Rules Average Sequence and Series (Series) Number System Powers and Exponents (Surds and Indices) Algebra Profit and Loss Simple Interest and Compound Interest Time and Work Pipe and Cistern Speed Time and Distance Mixture and Alligation Mensuration and Geometry Age Problems Partnership Statistics Data Interpretation Arithmetic
  4. Prelims: General Agriculture: Agriculture in India and Tripura Natural Resource Management Fundamentals of Crop Production Horticulture Crop Improvement Crop Protection Social Science
  5. IT Mains: Operating System: Introduction to OS Process Management CPU Scheduling Process Synchronization Threads & Process Creation Deadlock Memory Management Virtual Memory Disc Scheduling File Management Distributed Systems
  6. IT Mains: Computer Networking: Introduction to CN DLL: Access Control DLL: Flow Control DLL: Error Control Data Link Layer - Ethernet Net Layer: IPv4 & Proto Net Layer: IP Addressing Net Layer:Routing Protocol Transport Layer Services TL: Congestion & UDP Application Layer Hardware Basics Network Security
  7. IT Mains: DBMS: Basics of DBMS ER Diagram Relational Model & Functional Dependencies Keys & Integrity Constraints Normalization (1NF - BCNF) Decomposition Properties & 4NF Relational Algebra SQL Relational Calculus Transaction Management Concurrency Control Database Recovery Big Data Systems Database Security & Authorization Enhanced Data Models NoSQL
  8. IT Mains: Software Engineering: Fundamentals of Software Engineering Software Requirements and Quality Assurance Software Design, Estimation and Metrics Software Testing Software Maintenance and Configuration Management
  9. IT Mains: Data Structures & Algorithms: Introduction to DS Array Stack Queue Linked List Tree Graphs Hashing Algorithm Analysis Time Complexity Analysis Sorting Algorithms
  10. IT Mains: OOPS with C++ & Java: C Fundamentals OOPS with C++ Java Fundamentals Array, String, IO & References OOPS with Java Generic & Collections Multithreading File Handling & I/O
  11. IT Mains: Python: Introduction to Python Tokens, Variables, Data Types, I/O Operators & Expressions Control Flow & Looping Collections & Strings Functions & Modules
  12. IT Mains: Website Development: Website, Browser & Services Internet Fundamentals Web Design & Development Protocols & Services Web Publishing & Hosting Server Side & Security Emerging Technologies HTML Basics HTML5 CSS JavaScript-Basics .Net Programming PHP
  13. IT Mains: Mobile App Development: Mobile Computing Multimedia
  14. IT Mains: Linux / Windows Server Admin: Unix OS Linux OS
AI summary & chapters

AI Summary

An AI-generated summary of this video lecture.

The video demonstrates a Round Robin scheduling practice problem. The instructor sets up a table for six processes (P0-P5) with arrival and burst times, then constructs a Gantt chart using a time quantum of 3 units. A queue box tracks the ready processes as they are scheduled. The instructor calculates completion times, turnaround times, and waiting times for each process, ultimately deriving the average turnaround time and average waiting time. The solution involves tracking process execution across multiple time slices and managing the ready queue as new processes arrive and others complete.

Chapters

  1. 0:00 – 2:00 00:00-02:00

    The instructor introduces the problem: calculating average TAT and WT using Round Robin with a time quantum of 3 units. A table is set up with columns for P. No, Arrival Time (AT), Burst Time (BT), Completion Time (CT), TAT = CT - AT, and WT = TAT - BT. The arrival times are filled in as 5, 4, 3, 1, 2, 6 for P0 through P5, and burst times are listed as 5, 6, 7, 9, 2, 3. The instructor begins sketching a Gantt chart, starting with an idle region from 0 to 1, then scheduling P3 first since it has the earliest arrival time.

  2. 2:00 – 5:00 02:00-05:00

    The Gantt chart expands to show P3 executing from 1 to 4, followed by P4 from 4 to 6, P0 from 6 to 9, and P1 from 9 to 12. A pink Queue box on the right tracks the ready processes, initially showing P4, P0, P3, P5, then adding P2 and another P4 as processes arrive and wait. The instructor explains how processes are added to the queue upon arrival and how the quantum of 3 units determines when a process is preempted and sent to the back of the queue.

  3. 5:00 – 10:00 05:00-10:00

    The Gantt chart continues with P3 resuming from 12 to 15, then P0 from 15 to 18, P5 from 18 to 21, and P0 again from 21 to 24. The queue box updates to reflect the changing ready state, showing sequences like P1, P5, P3, P2, P4 shifting to longer sequences including P0 and P1. The instructor fills in the Burst Time column with values 8, 3, 4, 3, 2, 3 in pink and green ink, while the AT column remains 5, 4, 3, 1, 2, 6. The process of tracking remaining burst times and re-queuing preempted processes is emphasized.

  4. 10:00 – 13:20 10:00-13:20

    The instructor completes the table by filling in the CT column with values 32, 27, 30, 30, 06, 01, then calculates TAT as 27, 23, 27, 29, 04, 15, and WT as 22, 17, 23, 20, 02, 12. The final Gantt chart shows the complete execution sequence with time markers up to 33. The instructor computes the averages, showing 76/6 = 12.8 for average TAT and 96/6 for average WT. The queue box displays the final sequence P1 P0 P1 P3 P0 P5 P0 P1 P3 P0 P5, illustrating the full scheduling order.

This lecture provides a step-by-step worked example of Round Robin scheduling. The key concepts include: (1) setting up a process table with arrival and burst times, (2) constructing a Gantt chart that respects the time quantum, (3) maintaining a ready queue that updates as processes arrive and are preempted, and (4) calculating completion, turnaround, and waiting times. The method emphasizes that when a process's quantum expires, it is sent to the back of the queue with its remaining burst time. New arrivals are added to the queue in order of arrival. The final metrics are derived by summing individual TAT and WT values and dividing by the number of processes. The example demonstrates how to handle multiple preemptions and arrivals within a single scheduling problem.