Practice Question
Duration: 11 min
This video lesson is available to enrolled students.
Inside: a video lesson and guided study material.
Module outline
- Prelims: General Knowledge: Physics Chemistry Biology History Geography Polity Indian Economy Static General Knowledge GK- Current Affairs Environment
- Prelims: General English: Vocabulary Noun Pronoun Adjectives Preposition Articles Direct and Indirect Speech Tenses Conjunction Subject Verb Agreement (Verb Noun Agreement) Modals Sentence Re-arrangements (Para Jumbles) (Narrative Sequencing) Sentence Correction (Error Correction) Sentence Completion (Fill in the blanks) Comprehension / Reading Comprehension / Unseen Passages (Critical Reasoning) (Paragraph Questions) Cloze Test (Cloze Passage) Verbal Analogy (Word Based Analogy) Sentence Construction Adverb Verb
- Prelims: Quantitative Aptitude: Percentage Ratio and Proportion (Ratios) HCF LCM Divisibility Rules Average Sequence and Series (Series) Number System Powers and Exponents (Surds and Indices) Algebra Profit and Loss Simple Interest and Compound Interest Time and Work Pipe and Cistern Speed Time and Distance Mixture and Alligation Mensuration and Geometry Age Problems Partnership Statistics Data Interpretation Arithmetic
- Prelims: General Agriculture: Agriculture in India and Tripura Natural Resource Management Fundamentals of Crop Production Horticulture Crop Improvement Crop Protection Social Science
- IT Mains: Operating System: Introduction to OS Process Management CPU Scheduling Process Synchronization Threads & Process Creation Deadlock Memory Management Virtual Memory Disc Scheduling File Management Distributed Systems
- IT Mains: Computer Networking: Introduction to CN DLL: Access Control DLL: Flow Control DLL: Error Control Data Link Layer - Ethernet Net Layer: IPv4 & Proto Net Layer: IP Addressing Net Layer:Routing Protocol Transport Layer Services TL: Congestion & UDP Application Layer Hardware Basics Network Security
- IT Mains: DBMS: Basics of DBMS ER Diagram Relational Model & Functional Dependencies Keys & Integrity Constraints Normalization (1NF - BCNF) Decomposition Properties & 4NF Relational Algebra SQL Relational Calculus Transaction Management Concurrency Control Database Recovery Big Data Systems Database Security & Authorization Enhanced Data Models NoSQL
- IT Mains: Software Engineering: Fundamentals of Software Engineering Software Requirements and Quality Assurance Software Design, Estimation and Metrics Software Testing Software Maintenance and Configuration Management
- IT Mains: Data Structures & Algorithms: Introduction to DS Array Stack Queue Linked List Tree Graphs Hashing Algorithm Analysis Time Complexity Analysis Sorting Algorithms
- IT Mains: OOPS with C++ & Java: C Fundamentals OOPS with C++ Java Fundamentals Array, String, IO & References OOPS with Java Generic & Collections Multithreading File Handling & I/O
- IT Mains: Python: Introduction to Python Tokens, Variables, Data Types, I/O Operators & Expressions Control Flow & Looping Collections & Strings Functions & Modules
- IT Mains: Website Development: Website, Browser & Services Internet Fundamentals Web Design & Development Protocols & Services Web Publishing & Hosting Server Side & Security Emerging Technologies HTML Basics HTML5 CSS JavaScript-Basics .Net Programming PHP
- IT Mains: Mobile App Development: Mobile Computing Multimedia
- IT Mains: Linux / Windows Server Admin: Unix OS Linux OS
AI summary & chapters
AI Summary
An AI-generated summary of this video lecture.
This lecture demonstrates how to calculate Average Turnaround Time (TAT) and Average Waiting Time (WT) using the First Come First Serve (FCFS) scheduling algorithm. The instructor works through two practice problems on a whiteboard, using a table with columns for Process Number, Arrival Time (AT), Burst Time (BT), Completion Time (CT), TAT = CT - AT, and WT = TAT - BT. For the first problem, processes P0 (AT 0, BT 3), P1 (AT 2, BT 2), and P2 (AT 6, BT 4) are scheduled in arrival order. A Gantt chart shows P0 running from 0 to 3, P1 from 3 to 5, an idle gap from 5 to 6, and P2 from 6 to 10. Completion times are 3, 5, and 10, giving TAT values of 3, 3, and 4, and WT values of 0, 1, and 0. The instructor writes Avg TAT = 10/3 and Avg Waiting Time = 1/3. A second problem uses processes with AT 0, 0, 1 and BT 4, 6, 3. The Gantt chart shows P0 from 0 to 4, P1 from 4 to 10, and P2 from 10 to 13, with CT values 4, 10, 13, TAT values 4, 10, 12, and WT values 0, 4, 9. The instructor writes Avg TAT = 24/3 and Avg WT = 13/3. Ready and Run state diagrams are used to track which processes are waiting and which is executing.
Chapters
0:00 – 2:00 00:00-02:00
The whiteboard displays the question: 'Calculate the Average Turnaround Time (TAT) and Average Waiting Time (WT) using the FCFS (First Come First Serve) Scheduling Algorithm.' A table is set up with columns P. No, Arrival Time (AT), Burst Time (BT), Completion Time (CT), TAT = CT - AT, and WT = TAT - BT. Rows show P0 (AT 0, BT 3), P1 (AT 2, BT 2), P2 (AT 6, BT 4), and an empty Average row. The instructor begins drawing a green Gantt chart below the table and labels Ready and Run states in a diagram.
2:00 – 5:00 02:00-05:00
The instructor builds the Gantt chart for the first problem: P0 runs from 0 to 3, P1 from 3 to 5, an idle gap is marked in red from 5 to 6, and P2 runs from 6 to 10. Time markers 3, 5, and 6 are written beneath the chart. He then fills the table with pink values: CT 3, 5, 10 and TAT 3, 3, 4. Red checkmarks and circles mark the AT values 0, 2, 6 and BT values 3, 2, 4, confirming the input data before computing derived columns.
5:00 – 10:00 05:00-10:00
The instructor completes the first problem by writing Avg Waiting Time = 1/3 and Avg TAT = 10/3 on the right side of the board, alongside Ready and Run circles containing P0, P1, P2. He then introduces a second problem with a new table headed Prd, AT, BT, CT, TAT, WT showing arrival values 0, 0, 1 and burst values 4, 6, 3. He sketches a green Gantt bar and a two-circle diagram labeled 'Ready P0, P1' and 'Run' with a magenta 'FCFS' label, circling the zero arrival entries for P0 and P1.
10:00 – 11:01 10:00-11:01
The second problem is completed on the board. The table shows CT values 4, 10, 13 and a TAT-BT/WT column listing 0, 4, 9. The instructor writes Avg TAT = 24/3 and Avg WT = 13/3. A green Gantt chart at the bottom displays P0, P1, P2 with time markers 4, 10, 13, confirming the execution order P0 (0-4), P1 (4-10), P2 (10-13).
The lecture teaches FCFS scheduling through two worked examples. The method is: (1) list processes by arrival time; (2) draw a Gantt chart showing execution order, including idle gaps when no process is ready; (3) compute CT from the Gantt chart; (4) compute TAT = CT - AT; (5) compute WT = TAT - BT; (6) average TAT and WT across all processes. Key evidence: first problem yields CT 3, 5, 10; TAT 3, 3, 4; WT 0, 1, 0; Avg TAT = 10/3; Avg WT = 1/3. Second problem yields CT 4, 10, 13; TAT 4, 10, 12; WT 0, 4, 9; Avg TAT = 24/3; Avg WT = 13/3. The Ready/Run diagram helps track which processes are waiting versus executing. Idle time in the Gantt chart (e.g., 5 to 6 in the first problem) does not contribute to any process's execution but affects completion times of later processes.

