Stop and Wait Protocol

Duration: 3 min

This video lesson is available to enrolled students.

Return to /learn/ACCENTURE-PREPARATION/ms-office-basic-it/dll-flow-control/basics-delay-analysis/asset-stop-and-wait-protocol after enrolling

Inside: a video lesson and guided study material.

Module outline

  1. Behavioral Assessment (Psychometric): Behavioral Assessment (Behavioral Competency Profiling) (Psychometric Test)
  2. Cognitive Assessment (Game-Based): Gamified / Game Based Aptitude Selection Decision Table (Decision Making) Puzzle Solving (Puzzles) Non Verbal Reasoning (Spatial Aptitude) (Spatial Reasoning) (Visual Reasoning) Analytical Reasoning (Counting Figures Reasoning) Cubes & Dices Coding Decoding Ranking, Order and Sequence Series (Number and Letter Series) (Numerical Relations and Reasoning)
  3. Common Applications & MS Office (Technical Assessment): MS Office by Yash Sir
  4. Pseudo Code (Technical Assessment): Pseudo Codes
  5. Networking, Security & Cloud (Technical Assessment): Introduction to CN Data Communication DLL: Access Control DLL: Flow Control DLL: Error Control DLL: Framing Data Link Layer - Ethernet Net Layer: IPv4 & Proto Net Layer: IP Addressing Net Layer:Routing Protocol Transport Layer Services TL: Congestion & UDP Application Layer Hardware basics Network Security Cloud Computing and IoT Cyber and Info Security Emerging Tech Trends
  6. Python (Technical Assessment): Python for Placements by Yash Sir
  7. Java (Technical Assessment): Java
  8. OOPs (Technical Assessment): Object Oriented Programming (OOPS)
  9. Data Structure (Coding Round): Introduction to DS Array Stack Queue Linked List Tree Graphs Hashing
  10. Algorithms (Coding Round): Algorithm Analysis Sorting Algorithms Greedy Algorithms Dynamic Programming Minimum Spanning Trees Shortest Path Algos Time Complexity Analysis Advanced Algorithms
  11. Coding Assessment Questions: C Programming by Yash Sir Coding Questions by Yash Sir Programming in C++
  12. SQL (Coding Round): SQL
  13. JavaScript Frontend (Coding Round): JavaScript
  14. Communication Test (Basic Verbal Ability): Vocabulary Sentence Construction Noun Pronoun Verb Tenses Subject Verb Agreement (Verb Noun Agreement) Articles Preposition Conjunction Adverb Modals Sentence Correction (Error Correction) Sentence Completion (Fill in the blanks) Comprehension / Reading Comprehension / Unseen Passages (Critical Reasoning) (Paragraph Questions) Communication Assessment
  15. HR Interview: MR & HR Interview Preparation
AI summary & chapters

AI Summary

An AI-generated summary of this video lecture.

This lecture introduces the Stop-and-Wait Protocol as a fundamental flow control mechanism in data communication. The instructor begins by establishing the problem of receiver overload, explaining that if frames arrive faster than they can be processed, storage becomes an issue. The core definition is presented: the sender transmits a single frame and then stops, waiting for an acknowledgment (ACK) from the receiver before proceeding. A timing diagram visually demonstrates this sequential exchange between Sender A and Receiver B, showing blue Frame blocks followed by orange ACK blocks. The instructor highlights the unidirectional nature of data transmission versus the auxiliary role of ACK tokens, emphasizing that this protocol effectively prevents buffer overflow by forcing the sender to slow down until confirmation is received.

Chapters

  1. 0:00 – 2:00 00:00-02:00

    The lecture opens with the title "Stop-and-Wait Protocol" displayed on a whiteboard alongside numbered text points. The instructor explains the necessity of flow control, noting that if data frames arrive at the receiver site faster than they can be processed, storage is required. Visible text states that normally receivers do not have enough space to store these frames. To prevent the receiver from becoming overwhelmed, a mechanism is needed to tell the sender to slow down. The instructor defines the protocol explicitly: "The sender sends one frame, stops until it receives confirmation from the receiver... and then sends the next frame." A diagram begins to appear illustrating the sequence of Frames and ACKs traveling between Sender A and Receiver B over time, with the instructor gesturing towards the text to highlight specific steps.

  2. 2:00 – 3:22 02:00-03:22

    The instructor elaborates on the timing diagram, which depicts Sender A and Receiver B exchanging blue "Frame" blocks and orange "ACK" blocks. Handwritten annotations like "RTT" appear on the timeline at the bottom of the diagram to indicate Round Trip Time. The visual aid emphasizes that while data frames are unidirectional, auxiliary ACK frames act as simple tokens of acknowledgment. The instructor gestures towards the sequence diagram to reinforce that the sender must wait for confirmation before transmitting subsequent data. This section solidifies the concept that flow control is achieved by stopping transmission after each frame until an acknowledgment confirms successful receipt, ensuring the receiver is not overwhelmed.

The Stop-and-Wait Protocol serves as a basic flow control method where the sender transmits one frame and waits for an acknowledgment before sending the next. This approach addresses the issue of receiver buffer overflow by ensuring that frames are not sent faster than they can be processed. The timing diagram clearly shows the alternating sequence of Frames and ACKs, with annotations like RTT indicating the time taken for a round trip. The protocol relies on unidirectional data flow supplemented by auxiliary ACK tokens, creating a simple yet effective mechanism for managing communication speed between Sender A and Receiver B.

Loading lesson…